Compare Rates
Residential Rates
Monthly Rate| Customer Charge: | $5.97 |
| Energy Charges: | |
| First 800 kWhr, per kWh | $0.06107 |
| Next 700 kWhr, per kWh | $0.05609 |
| All remaining kWhr, per kWh | $0.04950 |
| Minimum Charge: | |
| The minimum monthly charge shall be the Customer Charge | |
| Fuel Adjustment Clause: | |
| View the Clause | |
General Service Rates (Commercial)
Monthly Rate| Customer Charge: | $5.97 |
| Energy Charges: | |
| First 50 kWhr per kW of demand, per kWh | $0.09900 |
| Next 150 kWhr per kW of demand, per kWh: | |
| First 3000 kWhr per kWh | $0.07997 |
| Over 3000 kWhr per kWh | $0.05970 |
| All remaining kWhr per kWh | $0.04701 |
| Minimum Billing: | |
| The minimum monthly charge shall be the customer charge. | |
| Primary Metering: | |
| When the metering occurs at the primary voltage of the line serving the customer, the kWhr as metered shall be multiplied by 0.95. |
|
| Primary Service: | |
| When the customer maintains the necessary equipment, a credit of 0.220 per kW of demand will be applied to the monthly bill. | |
| Determination of Demand:* | |
| The monthly billing demand shall be the greater of: | |
|
|
| Fuel Adjustment Clause: | |
| View the Clause | |
*Applicable to all commercial and small industrial customers having demands or contracting for demands less than |
|
Industrial Rates**
MonthlyCharge| Energy Charge: | |
| First 30 kWhr per kVA of demand, per kWh | $0.12189 |
| Next 170 kWhr per kVA of demand: | |
| First 2000 kWhr, per kWh | $0.08010 |
| Next 8000 kWhr, per kWh | $0.06765 |
| Next 90,000 kWhr, per kWh | $0.05597 |
| All over 100,000 kWhr, per kWh | $0.04801 |
| For kWhr in excess of 200 times kVA: | |
| First 200,000 kWhr, per kWh | $0.03842 |
| All remaining kWhr, per kWh | $0.03283 |
| Minimum Charge: | |
| The minimum monthly shall be $2.75 per kVA of demand. | |
| Primary Metering: | |
| When the metering occurs at the primary voltage of the line serving the customer, the kWhr as metered shall be multiplied by 0.95. |
|
| Primary Service: | |
| When the customer maintains necessary equipment, a credit as follows shall be applied: | |
| 2,300-12,000 delivery voltage | $0.220 per kVA |
| 23,000 and over | $0.360 per kVA |
| Determination of Demand:* | |
| The monthly billing demand shall be the greater of: | |
|
|
| Power Factor Adjustment: | |
| For any month when the average lagging power factor is less than eighty five percent (85%), the utility shall make an additional charge of one percent (1%) of the total billing amount for each five percent (5%) between the average lagging power factor and eighty-five percent (85%). | |
| Fuel Adjustment Clause: | |
| View the Clause | |
| ** Applicable to all commercial and industrial customers having demands or contracting for demands in excess of 50 kW for a six (6) month period or longer. |
|
Private Outdoor Lighting
| Rate per month, per lamp: | |
| 175 watt mercury vapor** | $7.72 |
| 250 watt mercury vapor** | $9.90 |
| 400 watt mercury vapor** | $13.40 |
| 100 watt high pressure sodium vapor | $9.49 |
| 250 watt high pressure sodium vapor | $15.73 |
| 250 watt high pressure sodium vapor flood | $20.43 |
| 400 watt metal halide flood | $20.20 |
| Term: | |
| The minimum term for the private outdoor lighting ("Security Lights") service rate is one (1) year. | |
| ** Being eliminated from service, not available for new installation |
Penalties
A penalty of five percent (5%) shall be assessed all residential, commercial and industrial customers who fail to pay their electric bills on or before the fifteenth day after said bill is issued by the utility billing office.
Fuel Adjustment Clause
The energy charge for each electric customer shall be adjusted by decrease or increase in the cost per kilowatt hour in the same direct amount that the decrease or increase in the cost of producing the energy per kilowatt hour shall be caused directly by the change in the cost of fuel.
Changes in the cost of fuel shall be the difference in the cost of fuel during the month in consideration versus the cost of fuel during a month pre-selected and established as a base month and during which month the basic cost of the rate schedules are established.
The fuel clause adjustment cost per kilowatt hour shall be a weighted average cost of fuel required for all generated power and the actual charge adjustment for fuel for all purchased power. Calculation of the factor shall be a calculation of the total difference in fuel costs for generation converted over to differential cost per kilowatt hour of generated power multiplied by the total generated kilowatt hours added to the differential cost per purchased kilowatt hour, multiplied by the total kilowatt hours purchased, then this sum divided by the total kilowatt hours consumed.
The fuel cost that shall be used as the base month for generated power shall be 0.032 per kilowatt hour. Purchased power fuel clause adjustment factor shall be the exact quoted figure as shown on the purchased power billing provided that the base month of calculation is the same as the city’s base month. If the base month of calculation of the selling agency does not coincide, then an adjustment shall be made first to include all adjustments between the selling agency’s base month and the city’s base month for fuel adjustment.
Amended by Ordinance Number 28-06 (15% increase)
(Effective August 1, 2006)
Dover provides a reliable source of utility services that are critical to the operation of our hospital,
every single day. 
Bill Harding, Union Hospital